As a result of the ETI visit and all the extra stress involved, luthier work has been limited.
the guitar has had the back braced and fitted to the body.

the top braced

and fitted


the two mandos both have strings on, and need a little setting up to finish them. the one with the bone saddle in the bridge still needs the pickup fitted.
sadly I WON'T have them done before the Half term break which starts at 1pm tomorrow, but they WILL (hopefully anyway) be done by the end of the week we get back.

